Betekenis van:
end run

end run
Zelfstandig naamwoord
    • (American football) an attempt to advance the ball by running around the end of the line

    Synoniemen

    Hyperoniemen


    Voorbeeldzinnen

    1. Their contract is to run out at the end of this month.
    2. Saying that you would rather learn Spanish than Esperanto is like saying you would rather run a marathon than go for a Sunday walk; of course you end up doing neither.
    3. And when the hourglass has run out, the hourglass of temporality, when the noise of secular life has grown silent and its restless or ineffectual activism has come to an end, when everything around you is still, as it is in eternity, then eternity asks you and every individual in these millions and millions about only one thing: whether you have lived in despair or not.
    4. A precompiled binary for end users to download and run both SPECviewperf and Linpack.
    5. However, the emergency vaccination plans run until the end of 2008.
    6. The high-end server segment includes a mix of non-x86 and x86 based servers that run various applications, delivering the same type of end solution.
    7. Further, were provisional measures (which should run in parallel with the investigation) to come to an end in Q4 2004, this would create uncertainty in the market during its busiest period in the run up to Christmas.
    8. However, where the same funds are used during a later financial year, the five-year time limit shall run from the end of that financial year.
    9. In accordance with section 3.2, if it has been agreed that only one test cycle (ESC or ETC) be run at each test point and the other test cycle (ESC or ETC) run only at the beginning and end of the service accumulation schedule, the deterioration factor calculated for the test cycle that has been run at each test point shall be applicable also for the other test cycle, provided that for both test cycles, the relationship between the measured values run at the beginning and at the end of the service accumulation schedule are similar.
    10. In accordance with paragraph 3.2., if it has been agreed that only one test cycle (ESC or ETC) be run at each test point and the other test cycle (ESC or ETC) run only at the beginning and end of the service accumulation schedule, the deterioration factor calculated for the test cycle that has been run at each test point shall be applicable also for the other test cycle, provided that for both test cycles, the relationship between the measured values run at the beginning and at the end of the service accumulation schedule are similar.
    11. In accordance with section 3.2, if it has been agreed that only one test cycle (ESC or ETC) be run at each test point and the other test cycle (ESC or ETC) run only at the beginning and end of the service accumulation schedule, the regression analysis shall be made only on the basis of the test results from the test cycle run at each test point.
    12. In accordance with paragraph 3.2., if it has been agreed that only one test cycle (ESC or ETC) be run at each test point and the other test cycle (ESC or ETC) run only at the beginning and end of the service accumulation schedule, the regression analysis shall be made only on the basis of the test results from the test cycle run at each test point.
    13. At the request of the manufacturer and with the agreement of the type-approval authority, only one test cycle (either the ESC or ETC test) need be run at each test point with the other test cycle run only at the beginning and at the end of the service accumulation schedule.
    14. In accordance with section 3.2, if it has been agreed that only one test cycle (ESC or ETC) be run at each test point, the other test cycle (ESC or ETC) must be run at the beginning and end of the service accumulation schedule.
    15. At the request of the manufacturer and with the agreement of the approval authority, only one test cycle (either the ESC or ETC test) need be run at each test point with the other test cycle run only at the beginning and at the end of the service accumulation schedule.